GSPANN and an anonymised specialty retailer: IBM Sterling test automation case analysed

Verdict: what is checkable

The evidence grade (this site's label for how a case is sourced: primary with client or press confirmation, secondary when vendor-hosted only.) is secondary: the only source is the vendor's own page; of 8 metrics, 0 are verifiable yes, 0 partial and 8 no. [ev-0982]

Client profile as published

Client
A leading US-based retail company that sells high-quality home furnishings and kitchenware. (the vendor's description; the vendor does not name the client)
Segment
Specialty retail
Region
US
Channels
not stated
Size indicators
billion-dollar retailer; multiple premium brands; omnichannel specialty retailer

The client description and size indicators are quoted from the source; segment, region and channels are this site's classification. [ev-0982]

Systems in scope

  • OMS (order management system: software that routes, splits and tracks customer orders across stores, warehouses and carriers.) (IBM Sterling OMS): named in the Challenge section
  • WMS (warehouse management system: software that runs receiving, storage, picking and shipping inside a distribution center.) (Warehouse Management for Open Systems (WMOS)): named in the Challenge section
  • Integrations (Microsoft Dynamics 365, Oracle, Microsoft Azure): named in the Challenge section

Where the source names each system is quoted or summarised from the case page. [ev-0982]

Problem as stated

Releases of the retailer's Microsoft Dynamics 365 workflows were held up by manual testing. Dynamics 365 is tightly linked to IBM Sterling OMS, WMOS, Oracle and Azure, so each release needed end-to-end checks that took 2 to 3 weeks. Each premium brand needed its own repeated cycle. Thin documentation tied testing to a few specialists, and manual errors caused rework and delayed releases. [ev-0982]

every release required extensive end-to-end testing (quoted from the source)

Approach

Testing types
automation, api and functional (main scope: automation)
Team shape
not stated
Duration
not stated
Engagement model
not stated
Tooling named in the source
Java, Selenium 4, Cucumber 7, JUnit 5, RestAssured 5, Allure Reporting, Report Portal, Azure Portal

Metrics claimed

Metrics as published, with who claims each and what this site could check.
MetricValueUnitClaimed byVerifiableEvidence
release cycle time reduction90%vendornoev-1571
monthly savings from reduced manual testing effort$7,000-$10,000USD per monthvendornoev-1572
regression testing duration5-7 days to just hoursdaysvendornoev-1573
manual testing hours saved per month140-150hours per monthvendornoev-1574
annual savings from reduced error correction and rework$10,000+USD per yearvendornoev-1575
potential annual revenue increase5-7%vendornoev-1576
automated test pass rate90%+%vendornoev-1577
business-critical scenarios automated100+scenariosvendornoev-1578

What the case does not say

  • Measurement method.
  • Duration over which the metric held.
  • Team size on both sides.
  • Cost.
  • What was out of scope.
  • Whether the client is still a client.
  • Date of the work.

Reading notes for a buyer

This case speaks to the scenario “OMS or WMS replacement” and feeds dimension D4 (Test automation evidence) of the methodology. A question to put to GSPANN:

How were the monthly hours and dollar savings measured, and which automated scenarios run against Sterling OMS and WMOS rather than Dynamics alone? [ev-0982]

Source and verification

Source
Dynamics 365 Test Automation Cuts Release Time by 90%
Published
not dated by the vendor
Verified
2026-10-30
Evidence grade
secondary
Corroborating sources
none found
Evidence records for this case.
IdClaimSourceClassGradePublishedVerified
ev-0982Dynamics 365 Test Automation Cuts Release Time by 90%Dynamics 365 Test Automation Cuts Release Time by 90%vendor-case-studysecondary2026-10-30
ev-157190% reduction in release cycle time from 2-3 weeks to 1-2 daysDynamics 365 Test Automation Cuts Release Time by 90% | Case Study | GSPANNvendor-case-studysecondary2026-10-30
ev-1572$7,000-$10,000 monthly savings through reduced manual testing effortDynamics 365 Test Automation Cuts Release Time by 90% | Case Study | GSPANNvendor-case-studysecondary2026-10-30
ev-1573Regression testing compressed from 5-7 days to just hoursDynamics 365 Test Automation Cuts Release Time by 90% | Case Study | GSPANNvendor-case-studysecondary2026-10-30
ev-1574140-150 hours per month saved in manual testing activitiesDynamics 365 Test Automation Cuts Release Time by 90% | Case Study | GSPANNvendor-case-studysecondary2026-10-30
ev-1575$10,000+ annual savings from reduced error correction and reworkDynamics 365 Test Automation Cuts Release Time by 90% | Case Study | GSPANNvendor-case-studysecondary2026-10-30
ev-15765-7% potential annual revenue increase through faster time-to-marketDynamics 365 Test Automation Cuts Release Time by 90% | Case Study | GSPANNvendor-case-studysecondary2026-10-30
ev-157790%+ automated test pass rate, ensuring consistent quality deliveryDynamics 365 Test Automation Cuts Release Time by 90% | Case Study | GSPANNvendor-case-studysecondary2026-10-30
ev-1578Automated 100+ business-critical scenarios across integrated enterprise systemsDynamics 365 Test Automation Cuts Release Time by 90% | Case Study | GSPANNvendor-case-studysecondary2026-10-30

Vendor profile: GSPANN. System facet: OMS and WMS testing vendors.

Positions on this page are computed from the methodology published at /methodology/ and from the evidence records linked on this page. Case study figures are the vendor's or the client's claims as published at the linked source; the "verifiable" column states what this site could check. The site does not recommend vendors, does not accept paid placement and does not publish rates. Last computed: 2026-11-03.

Published by the editor of retailqavendors.com. Last reviewed .